Shallow Exploratory Core Drilling
for Phosphate Ore Reserves

Genesis Mining invites qualified, licensed drilling contractors to submit sealed technical and commercial proposals for a phosphate exploration program in Egypt.

Total Volume
4,000 – 5,000 Linear Meters
Boreholes
~165 Vertical Holes
Timeline
40 Calendar Days
Submission Deadline
28 June 2026
01 — Executive Summary
Project Scope & Overview
Conventional Core Drilling methods are employed to optimize operational cost while securing high-quality lithological data for phosphate ore estimation.
Target Commodity
Sedimentary Phosphate Rock
Drilling Method
Conventional Core Drilling
Rigid single / double tube core barrels
Average Hole Depth
20 – 30 meters per borehole
Grid Spacing
1,000 m (1 km) regional exploration spacing
Location / Governorate
Dakhla Oasis, New Valley Governorate, Egypt
Clarification Inquiries
Deadline: 21 June 2026
Submission Structure
Envelope A — Technical Proposal & Prequalification Documents  ·  Envelope B — Commercial / Financial Proposal
Drilling rig in Egyptian desert
02 — Technical Specifications
Equipment & Standards
All equipment, methods, and operations must comply with the following requirements throughout the entire project duration.
RequirementSpecificationStatus
Rig MobilitySelf-propelled Track-mounted (Crawler) or Truck-mounted units strongly preferred to minimize inter-hole relocation time across 1 km gridPreferred
Towed / Skid UnitsAcceptable only if Contractor demonstrates dedicated high-capacity support vehicles — no reliance on Company machineryConditional
Core DiameterHQ diameter (ideal). Reduction to NQ requires written authorization from Chief GeologistMandatory
Core Recovery RateMinimum 90% within mineralized phosphate zones — strictly mandatoryMandatory
Core BoxesDurable boxes supplied by Contractor, marked with Hole ID & depth intervals. Cost included in unit rateMandatory
Water, Fluids & FuelContractor solely responsible for sourcing, procurement, transport, and storage. All costs built into unit ratesMandatory
Site PreparationContractor provides wheel loader or equivalent. All costs borne by ContractorMandatory
Camp & AccommodationContractor solely responsible for all accommodation, meals, and personnel transportMandatory
Prequalification Documents (Technical Envelope): Company profile, commercial registration, track record in similar phosphate drilling, equipment list, key personnel CVs (Project Manager, Rig Supervisors, HSE Officer), and proposed 40-day execution schedule.
HQ core drill bit in phosphate rock
03 — HSE Requirements
Health, Safety & Environment
Genesis Mining enforces a zero-tolerance policy for safety negligence and environmental degradation.
Occupational Health & Safety
Full compliance with national mining safety frameworks. All crew equipped with PPE. Immediate reporting of all incidents to the Company safety officer.
Waste Management & Spill Prevention
No refuse or hazardous materials left on site. Secondary containment mandatory under all fuel tanks, generators, and rig engines.
Drilling Fluids
All polymers must be environmentally safe. Fluids contained in designated sump pits. Borehole plugging and capping mandatory upon completion.
Site Rehabilitation
Sump pits fully backfilled and leveled before rig demobilization. Violations result in financial deductions or immediate suspension.
04 — Commercial Terms & Pricing
Pricing Structure
All rates must remain fixed for the duration of the contract. The Linear Meter rate must inclusively cover drilling, core extraction, core boxes, water haulage, fuel, polymers, and crew labor.
#DescriptionUnitEst. Qty
1.0Mobilization & Site Setup — transport of all equipment, personnel, and temporary camp facilitiesLump Sum1
2.0Core Drilling — vertical drilling (~20–30 m per hole)Linear Meter4,000 – 5,000
3.0Core Consumables — core extraction, boxes, fuel, and waterLump SumAs required
4.0Inter-Hole Relocation — complete rig and support assets between nodes ~1 km apartPer Move164
5.0Standby Rate — authorized idle time due to Company delays. Rig must be fully crewedHourly RateAs required
6.0Demobilization — final site cleaning, borehole capping, and removal of all machineryLump Sum1
Penalties: 1% per week delay (capped 10%). Core recovery below 90% may result in withheld payment or re-drill. Advance payment 10% against unconditional Bank Guarantee. Retention 5% withheld per invoice. Progress billing processed monthly.
Genesis Mining geologist inspecting phosphate core samples - Hole GM-04
05 — Financial & Standby Terms
Financial Conditions & Paid Standby Terms
Payment framework, advance conditions, retention policy, and circumstances qualifying for paid standby as defined in this ITT.
Advance Payment
10% of contract value, granted against an unconditional Bank Guarantee prior to mobilization.
Progress Billing
Monthly — based on actual drilled and accepted linear meters, certified by the Company's site geologist in signed Daily Drilling Reports (DDRs).
Invoice Settlement
Approved invoices settled within 30 calendar days of certification.
Retention Deduction
5% withheld from each progressive invoice to secure site rehabilitation, core box deliveries, and environmental compliance.
10. Paid Standby Terms
ClauseQualifying Condition
10.1 Geological Instruction Delays in receiving mandatory site-specific technical instructions or approval for core diameter adjustments (e.g., HQ to NQ) from the Company's Chief Geologist.
10.2 Certification Delays Operational halts caused by the failure of the Company's site personnel to review or sign off on Daily Drilling Reports (DDRs) in a timely manner.
10.3 Force Majeure / Suspension Any direct, formal orders from the Company to cease all drilling operations at the site.
Standby rate is only payable for authorized idle time caused by the above Company-side conditions. The rig must be fully crewed and operationally ready during any claimed standby period. All standby claims must be documented and countersigned by the Company's site representative.
Ready to Submit?
Submit Your Quotation

Review all tender requirements carefully before submitting. Ensure your technical and commercial proposals comply fully with this ITT. All rates must remain fixed for the duration of the contract.

By submitting you confirm your proposal complies with all terms of this ITT  ·  Genesis Mining — Mining & Exploration Department

REF #GEN-DR-000000

Quotation Received

Thank you. Your proposal has been recorded and our procurement team will review it. You will be contacted at the email address provided.